English French German Italian Portuguese Russian Spanish

      Videos from the March 2020 field inspection

      Another well on the Rodriguez, we treated also doing just about 60 % oil cut...

      Another good Rodriguez well, doing close to 95 % pure oil, first well we did treat when we took over

      This well also had treatment done, doing 9 BBL/Day oilcut is 45-50 %...nice little well..

      Another well we treated, oilcut about 80 %, sweet oil, but heavy we get a premium for this.

      looking at the tanks + facility on the Rodriguez...oil in the tank as good as money in the Bank..

      Another well on the rodriguez lease doing well, about 2.5 to 3 BBL/Day...

      Videos from the March 2020 field inspection

      Yet another well had treatment and submersible pump, treatment has to sit for 10 days then we pump.

      BIG SUCCES - Out on the Rodriguez lease where did change out some old pumpjacks to submersible pumps. Doing Good.

      Stockard lease "succes" - One of the wells we treated with succes now doing 10-12 bbl/day not bad for small shallow well.

      Video show´s the , seperator, oil in the thanks etc. all out on the Stockard leases

      Video showing the main stockard lease, as well tank battery facility

      Trip to the Stockard leases in Texas, where we have 27 wells producing at this time. this well is doing 14-16 BBL/Day....AMAZING

      Photos from the March 2020 inspection tour

      Illustration

      Stockard lease

      Illustration

      our grazing cattle keeping the grass chess, a cheaper grass mower does not exist .... : )

      Illustration

      Field Truck

      Illustration

      Glass with test oil, we have approx. 75% oil cut on this wells and it produces approx. 3.5 barrels a day

      Illustration

      One of our wells in the Rodrigues field, which is treated with the active bacteria we use to cleanse the formation and increase production, the well must sit for 10 days after treatment, after which it will start up again.

      Illustration

      Our tank battery out on the rodriguez lease

      Illustration

      Good old pumpjack...pumping away..

      Pictures & video from Stockard & Rodrigues leases

      Illustration

      Pumpjack out on Stockard lease

      Illustration

      Getting ready to put in flowlines

      Illustration

      Pumpjack out on Stockard lease

      Illustration

      Tanks

      Illustration

      Pumpjack out on Stockard lease

      First flight with our operators drone on the Stackard lease