St. Martin Bank & Trust Work Report- All going well with Operation(s). Will see a Phase 1 Supplemental for $85,000.00 due to (1) repair hole in casing (squeeze and drill out); (2) repair well right below surface (welding); and (3) replace a couple of joints of pipe.
Currently pulling out fish (tool that service company dropped in the hole)- This part of the work is all on service company (their fault, their cost).
If all goes well this morning- should start changing out pump today- Looking to be on production by end of next week.